Figure 4. Plan of the felt hat facility. On the left side is the actual configuration of the main departments, while on the right is the new building made available for the production and finishing operations. The re‐design study presented in this paper is only concerned with the new building in Figure 4, which comprises two different areas, as shown in Figure 5.