Since the flood irrigation system was constructed in June of 2006, the right side
of the clay and stone in the flood irrigation zone has collapsed due to natural causes
and human foot traffic. This damage has altered the movement of water along the slope
of the ladder. Hence, the flow rate cannot be controlled for adequate hydraulic retention
time to achieve the expected removal efficiencies for nitrogen and phosphorous in the
system.