and fly ash to a weigh hopper that feeds the material into the mixer by gravity. Dried, cydoned mill tailings are also fed into the mixer via a conveyor belt from a 45·tonne tailings storage bin. A batching cycle takes 12 min to complete, and batch composition is similar to that produced at the Buick Mine.