For 4 of the 5 study years, the daily amount of TEUs removed from BNP did not decline significantly with sampling effort, measured as the number of contractor working days (Table 3). Only in 2010, did greater sampling effort correlate negatively with total TEUs recovered, though the slope of this decline was modest (slope = 2.7).