I would suggest the agenda as follows.
Commom room:
1. All marble finishes need to be improved, - dwp to advice
2. Ultra TV screen panel details need to be adjusted to flush without glass covered and cabinet panel is too bulky - dwp to advice details
3. TV screen 54 " need to be sealed all gaps - dwp to advice details
4.To find cushion for the bench and sofa (add some color in the room) - dwp to advice the fabric specification and details
5. To design for artwork hanging in front of the white feature wall - 4 sets - by dwp advice the design
6. Bar stools on carpet floor are not stable - dwp to propose the solution
7. Concealed refrigerator change to show refrigerator with outside ice / water dispensor ( same serie as Tawanron ) - SCB BM advice refrigerator cataloge and dwp to advice details
8. Round stool at hall in front of the restroom need to be reupholstery - dwp to advice the fabric specification
Executive Dining room:
1.Propose alternative wallpaper as the long leadtime might cause project delay.
2.Projector screen location.
Please add up if any items are missing.