Dear Markus,
Thank you for your feedback. We will check on the requested information.
Fyi, the quantities provided earlier corresponds to the depot area. At the depot, the design is on embedded rail (sorry for not making it clear earlier). The contractor, Ch Karnchang provided the files attached in my previous email on base plate design as there is no specification on PU grout for embedded rail. The contractor intends to propose PU grout to the consultant/owner as they see the benefit of PU grout.
A question was posed by the contractor on how to ensure there is no level/step difference in transition from base plate to embedded rail. Can you provide your thoughts on this please?
Dear Thananat,
Please check with customer on the required information:
- Number of axles per car (to calculate wheel load)
- Type of rail
Thank you.