February 2013- March 2013
Owner : Thai Tank Terminal Limited
Project Name : Modification Pipe Line for Tank T-0501 Project
: 4''EDC Factory line Project
: Modification Tank T-1201 for EBO Project
Position : QC Supervisor
Responsibility : Field erection inspection of the pipe line.
The inspection was carried out such as welds visual inspection, test, hydrostatic test.