while robot moves , large reaction force is applied to the swiveling base from all directions.
consequently, the robot should be installed in such a manner that the foundation endures reaction force caused by accelerating or decelerating the speed to lock the robot, not to mention that it endures static loads.
repair uneven spots,crack, and others on the then install the robot by following to the table below. if thickness of floor concrete is less than needed level, an independent foundation should be constructed. inspect the foundation prior to the robot installation, and then construct the foundation, if necessary.