MCP inform the problem due to UOI deliver wrong part and shall charge to UOI as Mr. Pichit - QA Inspection was informed UOI about this problem but UOI can not deliver new parts to UOI on time to MCP production on 12-05-2015 and made MCP stop line since 15.30 - 19.30 PM, Line loss time 3.67 hr. The total charge is 106,989.68 baht.