Wee
Check with Por on whether we have sufficient data (soil data, highway plan, highway x-sections) for design with Vacuum consolidation (PVDV). Do not rely too much on the field vane tests, use OLD strength profile.
If no, let me know the missing document, I will be meeting with BR team tonight.
Please refer to our scope too, including VCM design report, sketches of VCM for BR to draw in AUTOCAD, specifications. The deadline is 6th Feb