In order to assess the beneficial and detrimental effects of the mechanical shredding, sampling was performed before and after the mechanical treatment. Sampling was done once per week at both the Dow Wetlands Preserve tidal marsh and the Antioch Marina pier (Figure 1). The mechanical treatment occurred at the Dow tidal marsh therefore one control and one treatment area was setup for consistent monitoring before and after the shredding (Madsen 1997).