The wastewater undergoes primary treatment at the Biological Treatment Plant of China University of Mining and Technology and then is channeled to a 1m×1m×0.75m×2 constructed wetland for secondary treatment. The vertical-flow beds are planted with Vetiveria izanioides. The substrate are 15cm gravel, 30cm Coal Slag and 10cm gravel from up to down (fig.1)