1. Close outlet valve and valves D and E.
2. Open valve T.
3. Empty the condenser by valve H.
Close valve H and T when the con-
denser is empty.
4. Start the vacuum pump.
5. Open valve E.
6. Open valve D and close valve E when
manometer the vacuum degasser
Reaches appr. 20 mbar.