• Extension of main building to receive waste conveyance systems, Autoclave, Coarse Screening
and main Motor control center (MCC)
• Installation of weigh bridge at adjacent main building
AAD (SW) Construction Execution Plan
[Lee Moor, May 2011]
Lee Moor_V002 - Construction Execution Plan 3 of 19 7/13/2011
• Amendments to adjacent storage building to receive fine screening equipment and transfer
pumps to AD plant
• Conversion and roofing of four tanks to advanced digestion process units with external
recirculation pumps and insulated walls
• Conversion of tank to house the packaged dewatering plant and drying equipment
• Conversion of tank to house centrate treatment packaged plant
• Conversion of tank for centrate storage
• Roofing and routing of pipework to two tanks for emergency storage facility
• CHP package plant and steam generation equipment installation on existing hardstanding
areas
• Provision of wash water booster system package plant
• Routing of transfer pipwork on existing bridges and cradles
• Site wide cabling of power and control
• Installation of works offices and facilities on existing hard standing