1.3 DEFINITION
In this HSE plan, the following words and expressions are used, and they have the respective meaning hereby assigned to them, except where the context otherwise requires:
"CONTRACTOR" means TTCL Public Company Limited is performing the “Engineering Procurement and Construction (EPC) of the project. (Please delete what not applicable to the project)
"OWNER" means “The Company” (Please Fill) employing construction in connection with the “Engineering Procurement and Construction (EPC) of the project. (Please delete what not applicable to the project)
"SITE" means the place or places so designated by owner for construction of the project including places adjacent thereto which are for storage and assembly of equipment and materials.
"SUBCONTRACTOR(S)" means the subcontractor(s) employed by contractor or the owner in connection with the construction of the project.
“HSE” means Occupational Health, Safety and Environment.
“HSE MS” means Occupational Health, Safety and Environmental Management System
“Standard” means HSE standard which requires condition, or the adoption or use of one or more practices, operations or process, reasonably necessary or appropriated to safe employee healthful and environmental impact protection, such as TIS etc.
“Construction Phase” means Construction activities comprising direct (prefabrication assembly, pre-commissioning up to mechanical completion, and other activity specified in Contract) and indirect (scaffolding, transport at site, maintenance of equipment etc.).
“OHSAS” means Occupational Health Safety Assessment Standard.
“TIS” means Thailand Industrial Standard.
“ISO” means International Organization for Standardization
“EIA” means Environmental Impact Assessment. The EIA report is identify the environmental sensitivities and impacts relevant to the project and environmental impact protection requirement.
“Hazard” means intrinsic property or ability of something (e.g. work materials, equipment, work methods and practices) with potential to cause harm.
“Risk” means compiling result of hazard severity and its likelihood that has potential to cause harm.
“3R Principle” means Waste Management Principle: Reduce, Reuse and Recycle.
“PTA” means Pre Task Analysis.
“PPE” mean Personnel Protective Equipment.
“ERT” means Emergency Response Team.