3) we have to confirm all parts (Group) accuracy (PIST%) result in inspection report must be 100%.
4) If there is out of tolerance situation, does supplier decide the action? (Conditional accept, repair, reproduce --- need to contact/discuss such items with MMTh-PQC.)