VII. RESULT COMPARISONS
Results from the proposed Monte-Carlo simulation
method were compared with results obtained from other
reliability estimation methods – Reliability Block Diagram,
Probability Tree, and Field Data; as illustrated in Table VII.
All the four methods agreed that generator inclusion can
increase the reliability of a DC UPS system, with Monte-
Carlo simulation method producing the highest difference in
MTBF values between with and without generator
configuration.