In addition to the above (5), OHJI brings the above 240m steel pileline back to its factory and replaces the inner rubber in the same method as that OHJI applies to the above 60m testing line at its own expenses. After that, OHJI re-install the pipeline at MTIS factory at OHJI's expenses.