"1.) PROD follow to the condition as same lot.
2.) Recheck sample ex.1/load.1 for compare eye check had NG same as the sample product.
3.) CM adjust colour in load#1. after run, DE* and eye check within spec ""OK""
4.) CM adjust colour in load#2. (PROD request continue run)
5.) PROD continue run load2 until to finished. Result DE* and eye check within spec ""OK""
For next action both CM & PROD. we will try to action as below detail.
- Gemba together CM & PROD. at weighing step & loading step & extruder run same condition.
- Mornitoring production follow condition last lot.
- Compare pellet sample and DE* last lot for solve any problem if we found."