(4) air conditioner
Machine room for installation of air-conditioning unit. (You can ensure the below 40 ° C)
(5) installation of Yang model h
H-(150 x 150) placed before the shaft on the bottom floor ceiling of that. (Load capacity: 5 tons)
(6) Internet connection
Installation terminals for connection to the Internet on every floor of it.
Lighting (7)
1st floor, 2nd floor, 14 F, 15F:600Lx other: 200 Lx
(8) other
Do not need air and water supply. * Confirmation required for sprinkler requirement (location).
(9) other