Thank you very much. But we also have the assembly of the LSW6K in Dubai, which was previously quoted, as per attached..
Once this is assembled, the Customer in Laos can use this unit immediately, and they do not ned to think about how to assemble and how to use.
In this case, can you also add item 4 (Labour for assembly of LSW6K) inside ? If item 3 is not required, it is no problem, we can leave it out due to the urgent requirement.
In the PO, can you also add this description : “To be directly shipped for a project in Laos” ?