The track north of this station shall remain as single track. The signals approaching the station for Southbound trains shall be replaced and comply with Drawing RW-SN-002 — TYPICAL STATION YARD SIGNALLING LAYOUT plan showing the approach signals to the station. Existing Token Block circuits shall be used, relocated if required, upgraded, and integrated into the operation of Samran station as determined by the engineer.
The equipment Room shall be used to terminate the cable system and install telecommunication equipment that interface to this contract.