Dear Ms. Patiluck,
First of all, thanks a lot for your kind cooperation in this project.
For design of M&E system, we’d like to clarify the following issues:
1. Piping as-built drawings of the existing ETP:
We’d like to get these drawings because we need to connect some pipe line of new ETP to the existing.
As-built drawings of new electrical room:
Up to now, the exact position of this room could not be located.
Your prompt reply would be highly appreciated. Nice day.