3) Flanged valves are to be secured to test stations by bolting, clamping, or use of a pneumatic clamping device.
4) Line from reservoir to test drum is to be designed for minimum pressure drop to allow reservoir volume to hold up test drum pressure when
needed.
5) Test drum pressure and piping are to be made of oxidation-resistant materials.