Construction Process
• Break Ground
• Excavation
• Foundation
o Concrete Forms
o Pour Foundation Wall
o Concrete Slab Pour
Gravel
Water Barrier
Rigid Foam
Rebar (and PEX tubing for radiant floor heating)
Pour Concrete for Slab
• Utilities
o Sewer, Electrical, Water, Gas
• Framing
o Balloon Framing
o Sheathing
o Roof
o Stairs
o Windows
• Roofing
• Weather Resistant Barrier
o Rain Screen
• Rough Plumbing
• Mechanical Sytems
o HVAC
• Lighting and Electrical
o Ambient
o Task
o Accent
o Perimeter
• Air Sealing
• Insulation
o Spray Foam, Blown-in Insulation, or Batt Insulation
• Drywall
o Sheetrock, Mudding, Sanding, Primer
• Siding
• Flooring
• Tiling
• Painting
• Cabinets, Shelving
• Finish Plumbing
• Finish Electrical and Lighting
• Certificate of Occupancy
• Modifications
• Moving In