Besides production and disposal of those parts the dataset encompasses:the energy required for the assembly phase;the transport of the input materials to the manufacturing industries and of the manufactured WPP-parts to the tray production firm;the connection activities to the grid;and,the gear oil change needed for the correct working of the plant.