Figure 10. Value stream map of the “as‐is” state. In the picture is
shown the production process with the duration of each activity
and the waiting time between workstations.
Figure 11. Future value stream map. The main time reductions
are related to the raw materials’ processing times and the final
transportation and waiting activities.