This case required the court to determine which of two insurers was liable for losses caused by fatigue
stress cracking to tubes in economiser blocks which were installed in a new waste recycling plant facility
(Facility) in respect of a project near Slough. Fourteen blocks made their way by road from Bucharest to
Constanta and then by ship from Constanta to Southampton. Two blocks were transported solely by road.