Activity time estimates usually can not be made with certainty.
•PERT used for probabilistic activity times.
•In PERT, three time estimates are used: most likelytime (m), the optimistictime (a) , and the pessimistictime (b).
•These provide an estimate of the mean and variance of a beta distribution