Terminal 2 opened to passengers on 4 June 2014.[34] The main terminal, officially known as the Queen's Terminal,[35] was built on the site of the original Terminal 2 and the Queen's Building. The building is designed by Luis Vidal + Architects (LVA).[8][36] The main Terminal 2 building was completed in November 2013 and underwent 6 months of testing prior to opening for passengers. The project includes the main Terminal 2 building, a 522-metre (1,713 ft) satellite pier (T2B), a 1,340 space car park and an energy centre and cooling station. Passengers can choose from a selection of 52 shops and 17 bars and restaurants.[37]