The annual electrical load must be met by the hybrid
power system with a 100% rate. The considered annual
real interest rate is 0.2%. The real interest rate is equal to
the nominal interest rate minus the inflation rate. The
project lifetime is 25 years.
The model constraints include:
– Maximum annual capacity shortage is 0%;
– Operating reserve is considered to be 10% of the
hourly load.