Precaution and measures Before powering on the switchboards: Remove all the special protections (sheets, dust protection covers, etc.) that would have been used during the switchboard connection period. .
Precaution and measures Before powering on the switchboards: Remove all the special protections (sheets, dust protection covers, etc.) that would have been used during the switchboard connection period. .