With regard to project construction system, the building consists of a reinforced concrete structure based on girders, columns and slabs, with two large side castings, and a foundation based on concrete piles up to two meters (6.56 feet) diameter and a depth of 22 meters (72.18 feet). The whole facade is ventilated and the cladding elements are hung, screwed or stapled, as the facade is completely disassembled. This will create a barrier thermo-acoustic-weather that makes the most efficient building. All installations are to the perimeter of the building for easy access and convenience, as well as soundproofing the interior thereof. In addition, the building has drainage systems, collection, filtering and storage of rainwater for reuse.
Also installed a plant for wastewater treatment, thereby unloading the building clean water to the canyon, and also filters and stores recover some of that water for watering gardens and washing cars.
Moreover, the building has facilities for fire, emergency plants needed to supply if necessary, access control, CCTV, and mechanical ventilation and extraction, among other things.
It is important to note that this entire building is modulated in three dimensions in feet, not to imitate other countries but because all materials are in proportions of feet.
This module based on a four by four feet, which allows the following: the use of better materials (as there is no cost of waste), overlaps in every sense of all the elements, making a work more quickly and cleanly (because there is the need for workshops and inventory adjustments), a lower initial investment (as there is no waste in cut) and a more connected to the ergonomic measures. This implies stringent controls work, but at the same time a unified action language that allows all participants require less supervision and consultation.