During the sixty-sixth session of the MEPC, a status
report on the update GHG study was considered, and
the steering committee informed that the consultants
subcontracted to prepare the study had submitted a
progress report in February. The steering committee
found that the work was on track to meet the set date
for the completion of the Third IMO GHG Study 2014,
and that the terms of reference of the study were
being met (IMO, 2013d).46