When developing estimates of construction cost during the design phase, all available specifications should be carefully studied, since many designers included items in the specifications which have significant cost implications., even though those items are not depicted on the drawings. The PM must pay close attention to the "boilerplate" contained in the contract documents to determine their impact on project costs.