First, we ctced Twn party "Euroland Enterprise Co., Ltd." for switch b/l at TPE on 21 Apr 2016. But Twn party
advd that they hv not rcved any information fm their shpr for said shpmt who will check it with their SGZ shpr
n confirm.
On 25 Apr 2016, Rcved information fm Twn party/Ms. Lee, that the said shpmt was no necessity to switch b/l
at TPE.
On 26 Apr 2016, Twn party advd that their shpmt needs to switch b/l at TPE n the penalty incurred at CNTAO
will be cnee "Qingdao Motelaier Industry & Trade Co., Ltd." a/c.
The same day, we hv sent the draft of switched b/l to Twn party n wait for their final conform.
The delay of switch operation has cause by Twn party.