1
During the preparation of the brief, the design team has consulted with the local authority on the provision or condition of the local cycling network and how the development could contribute to improving it.
2
One proposition has been chosen in agreement with the local authority and implemented. This proposition must be additional to what would have been done by the local authority without the support from the project and must have a significant impact on the local cycling network.