Please find attached revised bridge drawings in PDF and CAD with the new bridge location krub. I have some queries below, indicated in the attached sketch in green, that need clarification from all parties krub. Could you please respond as necessary krub:
Option 1
1. MITR+KCU - Could I please get some direction on how to determine the height of the electricity line after the electrical pole has been moved krub? Currently I have based the same heights as the CAD file previously sent by KCU before the electrical pole has been shifted krub. The height that I have shown is +16.38 krub.
2. CPN + MITR - Could you please confirm that the 33kV electrical line will go undergound krub. Distance is approximately 33m krub.
3. CPN - Could you please confirm distance of electrical poles (115kV and 33kV) from the bridge face krub. I have currently shown 10m to each side to allow for flexibility krub.
Option 2
3. CPN- Could you please confirm distance of electrical poles from bridge face krub (as per option 1)
4. MITR + KCU - Could you please confirm height of 33kV pole krub, and levels of powerlines. Current block I received from MITR shows the power lines very close to the ground krub.
Option 3
5. CPN + MITR - What happens to 115kV electrical line on CFP1 side of the road krub? Should I propose this line to go underground (below the road) as well krub? My understanding is that this 115kV line needs to cross the road to the other side somehow, but we have buried all our lines on the other side under ground krub.
Your response and assistance is much appreciated krub.