The plan of the building is divided into two longitudinal parallel bars. The eastern bar includes biomass treatment and the administration building, where the main entrance is located, and includes an exhibition space and a multipurpose hall. The western bar includes water and ice tanks, as well as the area for boilers, chillers and cooling towers.