The budget amount is 500K for all SAP projects include new licenses obtained.
For BOM project only , my estimation cost is around 300K krub, as the amount was verbal quoted by consultant since 2011 after we go live. And that the reason why I postponed at that time to ensure that the requirement is need. After that in 2012 I try my best to motivate K.Noung to raise the project but she did not krub until the issue of the production occurred and R&T need to change quite a lot of formulas for production in 2013 so that the requirement was need again.
In normal circumstances we do not need to change BOM automatically as we know that the changing of proportion of each material in the formula will not change in straight line method or constantly. So at the end of the day, we still do need to manual adjust the formula.