For the Route 1 in Buntong area and based
on the measurement distance travelled for the truck (6558 m), the time taken for the solid waste collection was
found to be 472 s. 17 stops have been designed in the route which resulted in 982 s total collection time in the
Route 1.In same trend, the collection times for the Routs 2 to 5 in Ipoh North, Kg Baru, Falim and Mengelmbu
were 937, 988, 938 and 952, respectively