Schedules
grading the project for a set of adaptation criteria including its size, requirements, and constraints.
(2) then assigning weighting factors to each criterion.
(3) multiplying the grade by weighting factors and by the entry point multiplier for the type of the project.
(4) computing the average of all results in the previous step.