9. Remove Lockout/Tag out devices
To remove locks and tags from a system that is now ready to be put back into service, the following general procedure can be used:
• Inspect the work area to ensure all tools and items have been removed.
• Confirm that all employees and persons are safely located away from hazardous areas.
• Verify that controls are in a neutral position.
• Remove devices and re-energize machine.
• Notify affected employees that servicing is completed.