6.2 Transportation from the site (ground floor) to the installation location will be done by subcontractor. Subcontractor shall provide enough manpower to carry equipments along to the location. Please study Customer regulation for more details
6.3 Transportation from “site A” (customer site) to “site B” (customer site) will be done by subcontractor. The vehicle shall be safety enough to protect load, rain, etc.
7. Project document and PATC concerns
7.1 Subcontractor shall provide documents related to subcontractor tasks to Huawei engineer with 7 days after finish installation.
7.2 Subcontractor shall perform pre-PAT by himself with your prepared document to verify correctness before official PAT with customer.
7.3 Subcontractor shall cooperate with Huawei engineer to perform pre PAT (Huawei and subcontractor) and modify all mistake issues related to hardware part in order to ensure no any mistaken when perform PAT with customer.
7.4 Subcontractor shall perform and cooperate with Huawei engineer to perform PAT with customer until PAT document (hardware part) has been signed by customer.
7.5 Subcontractor shall provide
7.5.1 Hard copy of subcontractor related tasks (for PAT purpose)
7.5.2 Completed document in CD-ROM 1 set. (Separate 2 folders 1. Survey report 2. Installation report)
8. Rules and regulation
8.1 All persons in the team must complete fingerprint scanning with Customer (or other customers, if needs)
8.2 Strictly follow customer regulation, for example
8.2.1 Scan finger before access site
8.2.2 Working period (start and end time)