The toe failure of the hydraulic sand-fill embankment was be-lieved to be caused by wash water transporting the hydraulic sand-fill at the top of the embankment at that stage of the con-struction, seeping downwards through the embankment sand-fill. The construction was suspended for an investigation to be carried out on the possibility of rapid build up of pore water pressure within the embankment.