Maybe I’ve misunderstood the last point of your e-mail. I mis-interpreted it as the procedure required for overall project.
Yes, we can develop these procedure you suggested. But I would suggest to develop 1 document with sub-heading capturing all the different type of project DC set-up. This way we don’t end up with the burden of maintaining multiple of procedures. I will elaborate on this point when presenting slide 5 of the DC segment.