The preservation of specimen hardwoods, the native topography and watershed were critical to the placement of the building footprint. The careful control of run-off and overland flow protects the watershed of Lind Creek at the north end of the site and ensures the proper irrigation and of the surrounding woodshed. Parking lot run off is filtered through bio retention swales and roof water is captured for grey water conveyance