2. We notice that you have provided 4 separate pipes for waste pipe, soil pipe, vent pipe, and kitchen discharge pipe. In Malaysia, we only used 2 pipes (combine waste and soil pipe as one vertical stack pipe and vent pipe), and kitchen pipe is discharge direct to floor trap (FT), then from FT to vertical stack pipe.