Thai Herrick
Safety Committee Notes
July 29, 2014 TH-Date
A decision needs to be made by management for the overhead crane that has the broken low speed if it is safe to use in high speed only? (It is not a good practice to operate a crane that cannot be load tested due to repair problems)
The lightning rods need to be installed at the PB factory.
Send pictures of the Bull and Mill machines at RIL to the Corporate Office.
Less capacity chain rigging has been obtained for the RIL factory. The Capacity of the chains needs to be clearly identified so they will not be over loaded. Management and supervision at the RIL factory need to ensure that the chains are not overloaded.
No load zone needs to be marked on the Tandem Sub Arc platforms.
Safety manager will start doing overhead crane training. No employee should be allowed to operate an overhead crane without first having some training.
The upper limit switch and the anti-collision sensors devices need to be checked daily.
A burn table is being converted to water.
Lockout procedures need to be done for all equipment the requires lockout for repair and maintenance.
The safety programs for the factories need to be updated.
Zurich Insurance will make a visit in Aug.
The Video Conference Safety meeting with the USA will be done at the factory locations. BKK office location will only be used for special events.
Next Meeting August 26, 2014 7:30 a.m.