The analysis is undertaken for two projects: a small scale coastal protection project using a revetment and a medium size capital harbour expansion using a breakwater. This work provides further insight into previously published work by Sheehan et al. (2009) on the economic aspects of geotube technology and identifies the optimum method of construction for each type of coastal structure.